You are here: Analysis Overview > Full Connectivity

Preparing for Analysis

Full Connectivity

Until all items are fully connected, you cannot select an analysis focus. If you try, unconnected items are displayed in red and an error report is generated.

Required Database Fields

Certain database information is required before an analysis can be run. For example, if you did not give the impedances of a cable, it is not possible to do a meaningful Short Circuit analysis. If you try to select an analysis focus without specifying all required database fields, you will get an error report listing the ID name and type of each incomplete item.

Recalculating Per-unit Data

EasyPower automatically keeps appropriate per-unit equivalencies of your equipment parameters updated. However if you open a very old database, you might want to force all of the per-unit data to be recalculated. This is done from the Database Edit focus by clicking Tools > Re‑calc Per-Unit. The updated per-unit values will be saved with the database the next time you save the database.

Tip: You can also press F9 to quickly recalculate per-unit data.

More Information

Analysis Overview  

www.easypower.com

EasyPower, LLC

7730 SW Mohawk St.

Tualatin, OR 97062

(503)655-5059

techsupport@easypower.com

feedback@easypower.com

EasyPower Version 9.6

Copyright © 1991-2014 EasyPower, LLC. All Rights Reserved.

Help was last updated on 8/26/2014